PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Building rebar mats for Elev. 1,2,3 (4th Floor) Facing East (800x600).jpg Excavation for the Tele-Data conecting the new building Facing South (800x600).jpg Pouring concrete at Stair -4 (3rd Floor) Facing Norht-East (800x600).jpg Saw cutting across Rahway Ave. Facing South(800x600).jpg Saw Cutting across Rahway view from the 2nd Floor (800x600).jpg Excavating across Rahway Ave. Facing North (800x600).jpg Excavation for the Tele-Data connecting the Court House Facing North (800x600).jpg Installing bearing plate boxes at Stair -2-Elev. 4 (4th Floor) Facing North-West (800x600).jpg
Previous pageNext page Saw cutting across Rahway Ave. Facing South(800x600)
Saw cutting across Rahway Ave. Facing South(800x600)